Line 9 (Chengdu Metro)
| Line 9 | |
|---|---|
| 9 | |
Line 9 platform at Huaxing station | |
| Overview | |
| Status | Operational |
| Owner | City of Chengdu |
| Locale | Chengdu, Sichuan |
| Termini |
|
| Stations | 13 |
| Service | |
| Type | Rapid transit |
| System | Chengdu Metro |
| Operator(s) | Chengdu Metro Corporation |
| Depot(s) | Yuanhua Depot (元华停车场) Wuqing Depot (武青车辆段) |
| Rolling stock | 8-car Type A (Driverless) |
| History | |
| Opened | 18 December 2020 |
| Technical | |
| Line length | 22.18 km (13.8 mi) (current) 43.9 km (in 2024) |
| Number of tracks | 2 |
| Character | Underground and elevated |
| Electrification | overhead lines, 1,500 V DC |
| Operating speed | 140km/h |
Chengdu Metro Line 9 (simplified Chinese: 成都地铁9号线; traditional Chinese: 成都地鐵9號線) is located in Chengdu, Sichuan and forms an extension to the existing Chengdu Metro system. The line officially opened on 18 December 2020.
Line 9 Phase I runs from Financial City East to Huangtianba and is envisioned to be the second loop line in Chengdu (after Line 7) in the future. Line 9's color is bright orange.
It is the first ever fully automated ATO GoA 4 metro line in Chengdu.
Line 9 uses high capacity Type A 8-car trains. The 13 stations were designed by London-based Sepanta in collaboration with Chinese architect Jiang & Associates Design.