Line 2 (Xuzhou Metro)
| Line 2 | |
|---|---|
| 2 | |
Line 2 train at depot | |
| Overview | |
| Native name | 徐州地铁2号线 |
| Status | Operational |
| Locale | Xuzhou, Jiangsu |
| Termini |
|
| Stations | 20 |
| Service | |
| Type | Rapid transit |
| System | Xuzhou Metro |
| Rolling stock | Type B (CRRC Nanjing Puzhen) |
| History | |
| Commenced | 2016 |
| Opened | November 28, 2020 |
| Technical | |
| Line length | 24.363 km (15.138 mi) |
| Number of tracks | 2 |
| Character | Underground |
| Operating speed | 80 km/h (50 mph) |
Line 2 of the Xuzhou Metro (Chinese: 徐州地铁2号线; pinyin: Xúzhōu dìtiě èr hào xiàn) is a rapid transit line in Xuzhou city, Jiangsu province, China. Construction commenced in February 2016, and the line was opened on November 28, 2020. It is the second metro line to open in Xuzhou.
Line 2 runs primarily north–south through Xuzhou's CBD and Xuzhou New District, from North Coach Station in the north to Xinchengqu East in the south.