Winterswijk–Zevenaar railway

Winterswijk–Zevenaar railway
Doetinchem station in 1966
Overview
Statusin use
LocaleNetherlands
Termini
Service
TypeHeavy rail
Operator(s)Arriva, Breng
History
Opened1885 (1885)
Technical
Line length49.6 km (30.8 mi)
Number of tracks
  • 2 (Zevenaar - Didam)
  • 1 (Didam - Winterswijk)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrificationno
Operating speed
  • 120 km/h (75 mph), Zevenaar - Didam
  • 130 km/h (81 mph), Didam - Wehl
  • 100 km/h (62 mph), Wehl - Winterswijk
Route map

km
time
Zutphen–Winterswijk railway
to Zutphen
0.0
Winterswijk
0:00
Boven-Slinge
Lichtenvoorde–Bocholt tram
11.9
Aalten
0:10
20.4
Varsseveld
0:17
Lievelde–Zeddam tram
27.3
Terborg
0:23
29.7
Gaanderen
0:26
Doetinchem Stadion
–:—
Doetinchem–Hengelo
GOLS railway
33.6
Doetinchem
0:31
Oude IJssel
36.1
Doetinchem De Huet
0:35
39.2
Wehl
0:40
Stillewald
45.4
Didam
0:45
Zevenaar Poort
(future station)
49.6
Zevenaar
0:51

Times shown are fastest timetabled
journey from Winterwijk.

The Winterswijk – Zevenaar railway is a 49-kilometre-long (30 mi) Dutch regional railway line, that connects Arnhem and Zevenaar with Doetinchem and Winterswijk.