Väo Power Plant

Väo Power Plant
Väo Power Plant
CountryEstonia
LocationVäo, Tallinn
Coordinates59°26′14″N 24°54′23″E / 59.43722°N 24.90639°E / 59.43722; 24.90639
StatusOperational
Construction began2007 (unit 1)
2014 (unit 2)
Commission date2009 (unit 1)
2016 (unit 2; expected)
OwnerOÜ Utilitas
OperatorOÜ Utilitas Tallinna Elektrijaam
Thermal power station
Primary fuelWood chips
Secondary fuelPeat
Cogeneration?Yes
Thermal capacity49 MW (unit 1)
76.5 MW (unit 2)
Power generation
Make and modelSiemens (unit 1)
MAN (unit 2)
Nameplate capacity25 MW (unit 1)
21.4 MW (unit 2)
Annual net output180 GWh
External links
Websitewww.elektrijaam.ee

The Väo Power Plant (also known as Tallinn Power Plant) is a biomass and peat-fired combined heat and power plant in Tallinn, Estonia. It's located in the eastern end of Tallinn in Väo, in a depleted part of Väo limestone quarry. The plant supplies heat to Lasnamäe and the central districts of Tallinn.

Construction started in 2007 and the power plant was commissioned in 2009. Originally, the project was started by Estonian businessman Urmas Sõõrumaa and was sold then to an affiliate of Dalkia. Since 2011 majority stake is owned by Estonian businessman Kristjan Rahu company Utilitas.

The power plant has capacity of 25 MW of electrical power and 49 MW of heat. It is fired by wood chips and peat. It has he a 70-metre (230 ft) high flue gas stack, supplied by Finnish company Noviter. The main contractor was KMG Inseneriehitus, turbine was provided by Siemens, fuel handling system provided by BMH Technology Oy, boiler was provided by Noviter and Metso.

In 2014, construction of the Väo 2 power plant with 21.4 MW of electrical power and 76.5 MW of heat capacity started. Like Väo 1, it is fired by wood chips and peat. The main contractor was Axis Technologies. The turbine was supplied by MAN SE. The plant was commissioned in 2016.