Ust-Srednekan Hydroelectric Plant
| Ust-Srednekan Hydroelectric Plant | |
|---|---|
Building of the dam in 2011 | |
| Official name | Усть-Среднеканская ГЭС |
| Country | Russia |
| Location | Ust-Srednekan, Srednekansky District, Magadan Oblast |
| Coordinates | 62°25′04″N 152°09′09″E / 62.41778°N 152.15250°E |
| Purpose | Power |
| Status | Under construction |
| Construction began | 1991 |
| Opening date | 2022 |
| Owner(s) | RusHydro |
| Dam and spillways | |
| Type of dam | Earth, concrete |
| Impounds | Kolyma River |
| Height | 74 m (243 ft) |
| Length | 2,490 m (8,170 ft) |
| Operator(s) | RusHydro |
| Type | Conventional |
Ust-Srednekan Hydroelectric Plant is a hydroelectric power station located on the Kolyma River near the village of Ust-Srednekan, Srednekansky District, Magadan Oblast Russia. It has an installed power generation capacity of 570 MW.
The dam is located 217 km (135 mi) downstream from the larger Kolyma Hydroelectric Station.