Ulu Jelai Power Station
| Ulu Jelai Power Station Stesen Janakuasa Ulu Jelai | |
|---|---|
| Country | Malaysia |
| Location | Cameron Highlands, Pahang |
| Coordinates | 4°27′1″N 101°35′7″E / 4.45028°N 101.58528°E |
| Purpose | Power, flood control |
| Status | Operational |
| Construction began | March 1, 2011 |
| Opening date | 2016 |
| Construction cost | RM2.4 billion |
| Owner(s) | Tenaga Nasional Berhad |
| Dam and spillways | |
| Type of dam | Gravity dam |
| Impounds | Bertam river |
| Height | 88 m (289 ft) |
| Length | 500 m (1,640 ft) |
| Width (crest) | 3 m (10 ft) |
| Width (base) | 115 m (377 ft) |
| Spillway capacity | 2,300 m3/s (81,000 cu ft/s) |
| Reservoir | |
| Creates | Susu reservoir |
| Catchment area | 0.1 km2 (0.039 sq mi) |
| Normal elevation | 540 m (1,772 ft) |
| Ulu Jelai Power Station | |
| Commission date | 2016 |
| Type | Underground |
| Hydraulic head | Rated: 330 m (1,083 ft) Maximum: 335 m (1,099 ft) |
| Turbines | 2 × 191 MW vertical Francis-type |
| Installed capacity | 382 MW |
| Capacity factor | 8% |
| Annual generation | 282 GWh (1,020 TJ) (estimated) |
The Ulu Jelai Power Station (Malay: Stesen Janakuasa Ulu Jelai) is a hydroelectric power station located in the district of Cameron Highlands, Pahang, Malaysia. It is one of the entry point projects under the Economic Transformation Programme.