Trinity Islands, Manchester
| Trinity Islands | |
|---|---|
Vista River Gardens towers 1 and 2 under construction | |
| General information | |
| Status | Building D1: under construction Vista River Gardens: under construction Building C2: proposed Building C1: proposed |
| Type | Residential |
| Location | Water Street, Manchester, England, United Kingdom |
| Construction started | 2022 |
| Estimated completion | 2026 |
| Cost | £535 million |
| Height | |
| Roof | Building D1: 183 m (600 ft) Vista River Gardens: 169 m (554 ft) Building C2: 146 m (479 ft) Building C1: 119 m (390 ft) |
| Technical details | |
| Floor count | Building D1: 60 Vista River Gardens: 55 Building C2: 48 Building C1: 39 |
| Design and construction | |
| Architect(s) | SimpsonHaugh |
| Developer | Renaker |
| Structural engineer | WSP |
| Other information | |
| Number of units | 1,950 |
Trinity Islands is a residential skyscraper cluster under construction in Manchester, England, consisting of four towers between 39 and 60 storeys split over two 2.2-acre (0.89 ha) sites: Building D1 at 183 metres (600 ft), Building D2 at 169 m (554 ft), Building C2 at 146 m (479 ft) and Building C1 at 119 m (390 ft). The project was designed by SimpsonHaugh and comprises 1,950 apartments, with a total build cost of £535 million. When completed in 2025, Building D2, renamed Vista River Gardens, will become the joint second-tallest building in Greater Manchester alongside Beetham Tower.