Teesta Low Dam - III Hydropower Plant
| Teesta Low Dam - III | |
|---|---|
| Official name | Teesta Low Dam - III Power Station |
| Country | India |
| Location | Rambi Bazar, Kalimpong district, West Bengal |
| Coordinates | 27°00′07″N 88°26′26″E / 27.0018057°N 88.4404352°E |
| Purpose | Power |
| Status | Operational |
| Opening date | 2013 |
| Construction cost | 768.92 Crores |
| Owner(s) | NHPC |
| Dam and spillways | |
| Impounds | Teesta River |
| Height | 32 m (105 ft) |
| Length | 144.5 m (474 ft) |
| Power Station | |
| Commission date | 2013 |
| Type | Run-of-the-river hydroelectric |
| Hydraulic head | 21.34 m (70 ft) |
| Turbines | 4 X 33 MW |
| Installed capacity | 132 MW |
| Annual generation | 594.07 million units |
Teesta Low Dam - III Hydropower Plant is a run-of-the-river hydroelectric station built on the Teesta River. The Dam is located at Rambi Bazar, Kalimpong district, West Bengal.