StatusOperational
Construction began2017 (TS1)
2018 (TS2)
Commission dateMarch 2019 (TS1)
September 2019 (TS2)
OperatorSwinerton Renewable Energy
Solar farm
TypeFlat-panel PV
single-axis tracking
Site area2,300 acres (930 ha)
Power generation
Nameplate capacity400 MWAC

The Techren Solar Project is a 400 megawatt (MWAC) solar photovoltaic power plant near Boulder City, Nevada. Electricity production began with completion of the two building phases in 2019–2020. The project is co-located with several other large solar power projects in the Eldorado Valley.