Porto Leixões Cruise Terminal
| Porto Cruise Terminal | |
|---|---|
| General information | |
| Status | Officially opened on the 23 July 2015 |
| Location | Matosinhos, Port of Leixões, Porto, Portugal |
| Country | Portugal |
| Coordinates | 41°10′37.8″N 8°42′7.5″W / 41.177167°N 8.702083°W |
| Opened | 23 July 2015 |
| Cost | 50 million Euros |
| Owner | Port of Leixões (APDL) |
| Design and construction | |
| Architecture firm | Luís Pedro Silva, Arquitecto |
| Structural engineer | Newton Engineering Consultants |
| Main contractor | Ferreira Build Power |
| Website | |
| http://www.apdl.pt/header | |
Porto Leixões Cruise Terminal is a purpose built terminal for ocean-going passenger ships built by the Port Authority of Douro, Porto, Portugal. The terminal was opened on the 23 July 2015.