Passau–Obertraubling railway

Passau–Obertraubling railway
Loewenwand
Overview
StatusOperational
OwnerDeutsche Bahn
Line number5830
LocaleBavaria
Termini
Stations17
Service
TypeHeavy rail, Passenger/Freight rail
Intercity rail, Regional rail
Route number880
Operator(s)DB Bahn, Agilis
History
OpenedStages between 1859–1873
Technical
Line length109.786 km (68.218 mi)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification15 kV/16.7 Hz AC overhead line
Operating speed160 km/h (99 mph)
Route map

km
138.1
Regensburg Hauptbahnhof
to Weiden and Regensburg port
135.2
Regensburg Ost
(goods station)
A 3 motorway overbridge
133.4
Regensburg-Burgweinting
130.4
109.8
Obertraubling
B 15 overbridge
to the Neutraubling industrial estate
105.6
Mangolding
Bridge over the Pfatter
100.9
Moosham (b Regensburg)
97.7
Taimering
92.3
Sünching
Bridge over the Große Laaber
to Geiselhöring
(to 1880)
86.3
Radldorf (Niederbay)
B 8 overbridge
from Mitterharthausen
(goods siding)
76.7
Straubing
to Bogen
B 20 overbridge
70.3
Amselfing
64.7
Straßkirchen
57.9
Stephansposching
A 92 motorway overbridge
52.3
Plattling
Bridge over the Isar
(x m)
B 8 overbridge
43.0
Langenisarhofen
36.9
Osterhofen (Niederbay)
31.5
Girching
27.9
Pleinting
21.4
Vilshofen (Niederbay)
15.1
Sandbach (Niederbay)
11.8
Seestetten
7.1
Schalding
A 3 motorway overbridge
4.9
Heining
B 12 overbridge
2.5
Passau-Auerbach
0.0
81.2
Passau Hauptbahnhof
80.6
Passau Tunnel
(169 m)
Bridge over the Inn
(110 m)
80.0
Passau-Voglau
79.6
border GermanyAustria
to Wels
km
Source: German railway atlas

The Passau–Obertraubling railway forms a key transport link from Germany to Austria and other southeast European countries and is one of the most important main lines in southern Germany. It is double-tracked and electrified throughout.