Panguil Bay Bridge
Panguil Bay Bridge | |
|---|---|
| Coordinates | 8°03′26″N 123°46′35″E / 8.05722°N 123.77639°E |
| Crosses | Panguil Bay |
| Locale | Tubod, Lanao del Norte and Tangub, Misamis Occidental |
| Characteristics | |
| Total length | 3.77 km (2.34 mi) |
| Longest span | 150 m (490 ft) |
| History | |
| Construction start | February 28, 2020 |
| Construction cost | ₱7.37 billion (2023 estimate) |
| Opened | September 27, 2024 |
| Replaces | Ozamiz–Mukas ferry |
| Location | |
The Panguil Bay Bridge is a 3.77 km (2.34 mi) extradosed bridge that crosses Panguil Bay. It connects Tangub in Misamis Occidental and Tubod in Lanao del Norte. It is currently the longest water-spanning bridge in Mindanao. It also reduces the travel time between Tangub and Tubod from 2.5 hours to just a few minutes.