One Za'abeel

One Za’abeel
General information
StatusCompleted
TypeMulti-building complex
Architectural styleModern
LocationZa'abeel, Dubai
CountryUnited Arab Emirates
Construction startedJanuary 2016
CompletedDecember 2023
Opening10 February 2024
Height
Top floor305 m (1,001 ft) (Tower 2)
235 m (771 ft) (Tower 1)
Technical details
Floor count68 (Tower 2)
59 (Tower 1)
Design and construction
Architect(s)Nikken Sekkei
DeveloperIthra Dubai
Main contractorALEC Engineering & Contracting LLC

One Za’abeel is a mixed-use skyscraper located in the Za’abeel district of Dubai, United Arab Emirates. The development was completed in December 2023 and officially opened on 10 February 2024. It consists of two towers connected by a horizontal structure known as The Link.