History
Planned openingMarch 2027 (March 2027)
Technical
Line length28.72 km (17.85 mi)
Number of tracksDouble-track
CharacterElevated and at-grade
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV 50 Hz AC overhead catenary

The Mallige line is an under-construction Bengaluru Suburban rail line between Benniganahalli to Chikkabanavara. The 27 km (17 mi) long broad-gauge line was approved in 2019 with its construction works commencing in 2022. The line which is also referred as 'corridor-2' is being built in two packages C2A and C2B respectively. The C1A package consists eight stations, while the C1B has four. The line is named after the flower Mallige (Jasmine) in Kannada.