Line F (Buenos Aires Underground)
| Line F | |
|---|---|
Network with line F, H and I complete | |
| Overview | |
| Status | In development |
| Termini |
|
| Stations | 13 |
| Service | |
| Type | Rapid transit |
| System | Buenos Aires Underground |
| Operator(s) | Metrovías |
| History | |
| Opened | 2022/2023 (planned) |
| Technical | |
| Line length | 8.6km |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line F is a planned addition to the Buenos Aires Underground. In 2019, the government of Buenos Aires was looking for a group to create a plan of the line, but this study was cancelled in 2022. The city decided to create a study with their own staff, which is still underway as of 2024. The estimated cost of the project has risen from 800 million dollars, to 2 billion USD.