Line 3 (Suzhou Metro)
| Line 3 | |
|---|---|
A train of Suzhou Metro Line 3 | |
| Overview | |
| Status | In operation |
| Owner | Suzhou Rail Transit Co., Ltd |
| Termini | |
| Stations | 37 |
| Service | |
| Type | Rapid transit |
| System | Suzhou Metro |
| Operator(s) | Suzhou Rail Transit Co., Ltd |
| History | |
| Opened | 25 December 2019 |
| Technical | |
| Line length | 45.272 km (28.131 mi) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 is an east-west line of the Suzhou Metro. The line is 45.272 kilometers long. The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District.
Line 3 started trial operations from December 6 to December 10, 2019. Official operation started on December 25, 2019.