Line 18 (Guangzhou Metro)

Line 18
Overview
Other name(s)North-South express line (Chinese: 南北快线)
Nansha express line (Chinese: 南沙快线)
StatusOperational
OwnerCity of Guangzhou
Termini
Stations8 (+1 under construction)
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangdong Intercity
(Wholly-owned subsidiary of Guangzhou Metro Corporation)
History
Opened28 September 2021 (2021-09-28)
(Wanqingsha–Xiancun)
Technical
Line length58.3 km (36.2 mi)
(Wanqingsha—Xiancun)
61.3 km (38.1 mi) (full Phase 1)
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV 50 Hz AC overhead catenary
Operating speed160 km/h (99 mph)
Route map

North extension
Reserved extension
Huachengjie
Ma'anshan Park
 9 
Huadu Railway Station (left)
Guangzhou North Railway Station
 9   24 
Fenghuangnanlu
Weihu Junction (
Guangqing intercity railway
connecting line
)
Airport Depot
 22  to Airport North (Terminal 2)
Fangshi
 22 
Baiyun Urban Center
 22 
Baiyun Dongping
 14 
Jingxilu
 3  to Airport North (Terminal 2)
 11 
Outer Circle
Inner Circle
Guangzhou East Railway Station
 1   3   11 
 1  to Xilang
Xiancun
 13 
 13 
to Chaoyang
to Xinsha
Modiesha
 8 
Longtan
 11 
 11 
Inner Circle
Outer Circle
Shaxi
Sanzhixiang Creek
Guangfo circular IR
Nancun Wanbo
 7 
Foguan IR
 3  to Haibang
Panyu Square
 3   22 
Line 22 interconnection
Shiqiao Creek
Longzhen Stabling Yard
Shawan Creek
Xili rescue point
Jiaomen Creek
Shanghengli Creek
Hengli
Xiahengli Creek
Wanqingsha
Shenzhan Railway
Nansha Port Railway
Qichong
Wanqingsha Depot
South-west extension
Shichong (reserved station)
Shisanchong
Ershichong
↑Guangzhou/Zhongshan↓
Hongqili Creek
Xiangshan
Reserved Zhuhai branch
Huoqudong (reserved station)
Huoqu
Huoquxi
Zhangjiabian Stabling Yard
Zhongshan
Qijiangdao
Qijiang New Town (reserved station)
Shiqi
Xingzhong
Reserved extension

Line 18 of the Guangzhou Metro (Chinese: 广州地铁18号线; pinyin: Guǎngzhōu Dìtiě Shíbāhàoxiàn) is a rapid transit express line in Guangzhou with trains operating up to 160 km/h (99 mph). It runs in a south-north direction, connecting Wanqingsha in Nansha District, Panyu Square in Panyu District, Modiesha in Haizhu District, Zhujiang New Town and Guangzhou East Railway Station in Tianhe District. The line commenced service on 28 September 2021.

Initially, there are train attendants on board each train. In the future, trains will operate fully driverless GoA4 mode when sufficient reliability from the signaling system has been confirmed.