Limerick Tunnel

Limerick Tunnel
Emergency exit in Limerick Tunnel
Overview
LocationLimerick, Ireland, crossing the River Shannon
RouteN18
StartAugust 2006
EndJune 2010
Operation
Opened27 July 2010 (2010-07-27)
Toll€2.30 (cars)
Technical
Length675 metres (740 yd) (immersed tube tunnel section)
No. of lanesTwo cells of 2 each
Tunnel clearance4.65 metres (15 ft) (external)

The Limerick Tunnel (Irish: Tollán Luimnigh) is a 675-metre-long (2,215 ft), immersed tube tunnel underneath the River Shannon on the outskirts of Limerick city. The tunnel forms part of the N18 Limerick Southern Ring Road. The tunnel is tolled.