| Hof–Bad Steben railway |
|---|
|
| Line number | 5021 |
|---|
| Locale | Bavaria, Germany |
|---|
| Termini | |
|---|
|
| Route number | 857 |
|---|
|
| Hof - Marxgrün opened | 1 June 1887 (1887-06-01) |
|---|
| Marxgrün - Bad Steben opened | 1 June 1898 (1898-06-01) |
|---|
| goods traffic ceased | 1994 |
|---|
|
| Line length | 27 km (16.8 mi) |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
|---|
| Operating speed | 60 km/h (37.3 mph) |
|---|
|
|
|
|
|
|
from Bamberg |
|
|
|
|
from Regensburg Hbf |
|
|
|
0,0 |
Hof Hbf, Bw |
|
|
|
|
to Leipzig Hbf |
|
|
|
|
B 2, B 173 |
|
|
|
2,3 |
Hof-Neuhof |
|
|
|
|
B 173 |
|
|
|
|
Spinnerei Neuhof siding |
|
|
|
4,5 |
Hof-Vogelherd |
|
|
|
6,9 |
Köditz (former station) |
|
|
|
|
A 9 |
|
|
|
11,1 |
Stegenwaldhaus (former station) |
|
|
|
13,1 |
Rothenbürg |
|
|
|
|
from Helmbrechts |
|
|
|
15,4 |
Selbitz (crossing station) |
|
|
|
|
St 2195 |
|
|
|
|
B 173 |
|
|
|
|
from Schwarzenbach a Wald |
|
|
|
18,8 |
Naila |
|
|
|
20,5 |
Oberklingensporn (LIBA Maschinenfabrik) |
|
|
|
|
Selbitz River |
|
|
|
|
St 2195 |
|
|
|
22,9 |
Marxgrün (former station and locomotive station) |
|
|
|
|
to Blankenstein |
|
|
|
|
St 2198 |
|
|
|
|
Hartsteinwerk Störrle siding |
|
|
|
24,2 |
Höllenthal |
|
|
|
27,0 |
Bad Steben (former station) |
|
|
|
|
|
|
|
|
|
|
The Hof–Bad Steben railway runs from Hof through the Franconian Forest to the Bavarian state spa town Bad Steben in southern Germany. The line was opened in two stages between 1887 and 1898.