Gas Interconnector Greece–Bulgaria
| Interconnector Greece–Bulgaria | |
|---|---|
| Location | |
| Country | Greece Bulgaria |
| General direction | South–North |
| From | Komotini, Greece |
| Passes through | Kardjali, Haskovo, Dimitrovgrad, Bulgaria |
| To | Stara Zagora, Bulgaria |
| General information | |
| Type | Natural gas |
| Partners | Bulgarian Energy Holding IGI Poseidon (DEPA & Edison S.p.A.) |
| Operator | ICGB AD |
| Commissioned | 2022 |
| Technical information | |
| Length | 182 km (113 mi) |
| Maximum discharge | 3 billion cubic metres per annum (110×109 cu ft/a) |
| Diameter | 32 in (813 mm) |
| Website | www |
Gas Interconnector Greece–Bulgaria is a natural gas pipeline from the Greek to the Bulgarian natural gas pipeline network. It became operational on 1 October 2022.