Dul Hasti Hydroelectric Plant
| Dul Hasti Dam | |
|---|---|
| Country | India |
| Location | Kishtwar, Jammu and Kashmir |
| Coordinates | 33°22′09″N 75°47′54″E / 33.3692°N 75.7984°E |
| Purpose | Power |
| Status | Operational |
| Construction began | 1985 |
| Opening date | 2007 |
| Dam and spillways | |
| Type of dam | Gravity |
| Impounds | Chenab River |
| Height | 70 m (230 ft) |
| Length | 190 m (620 ft) |
| Elevation at crest | 1,250 metres (4,100 ft) |
| Spillway capacity | 8,000 m3/s (280,000 cu ft/s) |
| Dul Hasti Hydroelectric Plant | |
| Coordinates | 33°17′13″N 75°45′44″E / 33.2869°N 75.7621°E |
| Commission date | 2007 |
| Hydraulic head | 200 metres (660 ft) |
| Turbines | 3 x 130 MW Francis-type |
| Installed capacity | 390 MW |
Dul Hasti hydroelectric power project, includes the existing Dul Hasti Stage-I Hydroelectric Power Project with 390 MW capacity and the under-construction Dul Hasti Stage-II Hydroelectric Power Project with 260 MW capacity, in Kishtwar district of Jammu and Kashmir in India built and operated by NHPC. Stage-I has been generating over 2000 Million Units of electricity per year.