Dongbeiwang station
| Beijing Subway station | |||||||||||
Construction site | |||||||||||
| Chinese name | |||||||||||
| Simplified Chinese | 东北旺站 | ||||||||||
| Traditional Chinese | 東北旺站 | ||||||||||
| |||||||||||
| General information | |||||||||||
| Location | Southeast side of the intersection of Houchangcun Road (后厂村路), Tangjialing Road (唐家岭路) and Software Park No. 4 Road (软件园四号路), Shangdi Subdistrict Haidian District, Beijing China | ||||||||||
| Coordinates | 40°03′07″N 116°17′20″E / 40.051919°N 116.28875°E | ||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
| Line(s) | Line 13 (Line 13B) | ||||||||||
| Platforms | 2 (1 island platform) | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Underground | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | Late-2025 (expected) | ||||||||||
| Previous names | Houchangcun (后厂村) (planning name) | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Dongbeiwang station (simplified Chinese: 东北旺站; traditional Chinese: 東北旺站; pinyin: Dōngběiwàng zhàn) is a future station on Line 13B of the Beijing Subway. It is expected to open in late 2025 as the western terminus of the combined newly constructed section of the planned Lines 13A and 13B, known as the Yizi line.