Deventer–Almelo railway

Deventer-Almelo railway
A NS Mat '64 before arriving at Deventer
Overview
StatusOperational
LocaleNetherlands
Termini
Stations6
Service
Operator(s)Nederlandse Spoorwegen
History
Opened1 September 1888
Technical
Line length38.5 km (23.9 mi)
Number of tracksDouble track
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1.5 kV DC
Operating speed130 km/h (81 mph)
Route map

km
0.0
Deventer
3.8
Deventer Colmschate
18.7
Holten
26.1
Rijssen
33.8
Wierden
38.5
Almelo

The Deventer–Almelo railway is an important Dutch railway line, that connects Deventer with Almelo, Netherlands.