| Dali–Lincang railway |
|---|
Lincang Railway Station |
|
| Native name | 大临铁路 |
|---|
| Status | Operating |
|---|
| Termini | |
|---|
|
| Type | Heavy rail |
|---|
| Operator(s) | China Railway Kunming Group |
|---|
|
| Opened | 30 December 2020 (2020-12-30) |
|---|
|
| Line length | 201.8 km (125 mi) |
|---|
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
|---|
| Electrification | 50 Hz 25,000 V |
|---|
| Operating speed | 160 km/h (99 mph) |
|---|
|
|
|
| Traditional Chinese | 大臨鐵路 |
|---|
| Simplified Chinese | 大临铁路 |
|---|
|
|
|
|
|
|
|
|
|
|
km |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Dalidong |
|
|
|
|
|
|
|
|
|
Dali |
|
|
|
|
|
|
|
|
|
Ruidamaidi tunnel |
|
|
|
|
Wumaolin |
|
|
|
|
Dacang |
|
|
|
|
Weishan |
|
|
|
|
Lishe river bridge |
|
|
|
|
Anle |
|
|
|
|
Linbaoshan tunnel |
|
|
|
|
Nanjian |
|
|
|
|
Liuwugu |
|
|
|
|
Xingzishan tunnel |
|
|
|
|
Ruobagu |
|
|
|
|
Xinhua tunnel |
|
|
|
|
Mekong (Lancang) river bridge |
|
|
|
|
Xiaowan East |
|
|
|
|
Yaojie |
|
|
|
|
Hongdoushan tunnel |
|
|
|
|
Zhangjiashan |
|
|
|
|
Luozha river bridge |
|
|
|
|
Luozhahe |
|
|
|
|
Yunxian |
|
|
|
|
Baishitou tunnel |
|
|
|
|
Toudaoshui |
|
|
|
|
Yangjiacun |
|
|
|
|
Yakouzhai |
|
|
|
|
Xipu |
|
|
|
|
Lincang |
|
|
|
|
|
|
|
|
km |
|
|
|
|
|
|
|
|
|
|
|
|
The Dali–Lincang railway (Chinese: 大临铁路) is a single-track electrified railway in China. The combined passenger and freight line is 201.8 kilometres (125.4 mi) long and has a design speed of 160 kilometres per hour (99 mph).