Collgar Wind Farm

Collgar Wind Farm
Collgar Wind Farm in 2019
Collgar Wind Farm in Australia
CountryAustralia
LocationNear Merredin
Coordinates31°32′35″S 118°27′16″E / 31.5430556°S 118.4545833°E / -31.5430556; 118.4545833
StatusOperational
Construction beganJune 2010
Commission dateMarch 2012 (2012-03)
Construction costA$750m
OwnerRetail Employees Superannuation Trust
Wind farm
TypeOnshore
Hub height80 metres (262 ft)
Rotor diameter90 metres (295 ft)
Site area18,000 hectares (180.00 km2)
Power generation
Units operational111 × 2.0 MW
Make and modelVestas V90-2MW
Nameplate capacity222 MW
Capacity factor34.24% (average 2012-2020)
Annual net output665.8 GWh (average 2012-2020)
External links
Website[www.collgarwindfarm.com.au]

Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia. It is operated by Collgar Renewables. With 111 Vestas V90-2.0MW wind turbines, and a total installed capacity of 222 MW registered with AEMO, it is Western Australia's largest wind farm. It became fully operational in October 2011 and is expected to generate 750 GWh per year on average over the 30-year life of the project.