Chegongmiao station

Chegongmiao

车公庙
Lines 7 and 9 concourse
Chinese name
Traditional Chinese車公廟
Simplified Chinese车公庙
Literal meaningCharioteer Temple
Transcriptions
Standard Mandarin
Hanyu PinyinChēgōngmiaò
Yue: Cantonese
Yale RomanizationChēgūngmiuh
JyutpingCe1gung1miu6
General information
LocationFutian District, Shenzhen, Guangdong
China
Coordinates22°32′10″N 114°1′33″E / 22.53611°N 114.02583°E / 22.53611; 114.02583
Operated bySZMC (Shenzhen Metro Group)
Line(s)
Platforms8 (4 island platforms)
Tracks8
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code120 (Line 1)
712 (Line 7)
915 (Line 9)
1117 (Line 11)
History
Opened28 December 2004 (2004-12-28) (Line 1)
28 June 2016 (2016-06-28) (Line 11)
28 October 2016 (2016-10-28) (Lines 7 & 9)
Passengers
201557,528 daily
Rank9th of 118
Services
Preceding station Shenzhen Metro Following station
Zhuzilin
towards Airport East
Line 1 Xiangmihu
towards Luohu
Nonglin Line 7 Shangsha
towards Tai'an
Xiangmei
towards Wenjin
Line 9 Xiasha
towards Qianwan
Hongshuwan South
towards Bitou
Line 11 Futian
Track layout
1 11 Upper platforms
1
2
3
4
7 9 Lower platforms
5
8
7
6

Chegongmiao station is a station on Line 1, Line 7, Line 9 and Line 11 of the Shenzhen Metro. It is located underneath Shennan Road, at the west of Xiangmihu Road, in Futian District, Shenzhen, China. It is near China Merchants Bank Tower and Donghai Pacific Mall.

It is the first four-line interchange hub in Shenzhen, and the second in mainland China after the Century Avenue station in the Shanghai Metro. The Line 1 platforms opened on 28 December 2004, the Line 11 platforms opened on 28 June 2016 and the Line 7 and Line 9 platforms opened on 28 October 2016.

This station provides cross-platform interchange between Line 7 and Line 9, but not between Line 1 and Line 11.