Alstom Movia R151

Alstom Movia R151
Alstom Movia R151 at Tuas Depot
Interior of the Alstom Movia R151
Stock typeElectric multiple unit
In service4 June 2023 (2023-06-04) – Present
ManufacturerChangchun Alstom Railway Vehicles (Alstom and CRRC Changchun)
Built atChangchun, China
Family nameMovia
Replaced
Constructed2020 –
Entered service4 June 2023 (2023-06-04)
Number built636 Vehicles (106 Sets)
Formation6 per trainset
DT–M1–M2+M2–M1–DT
Fleet numbers
  • 801/802 – 997/998 (excluding 899/900)
Capacity1920 passengers (224 seats)
OperatorsSMRT Trains (SMRT Corporation)
Depots
Lines served
Specifications
Car body constructionAluminium-alloy construction
Train length138.86 m (455 ft 6+78 in) (with 6 Cars)
Car length
  • 23.83 m (78 ft 2 in) (DT)
  • 22.8 m (74 ft 10 in) (M)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+58 in)
Doors1,450 mm (57+18 in), 8 per car, 4 per side
Maximum speed
  • 90 km/h (56 mph) (design)
  • 80 km/h (50 mph) (service)
Traction systemAlstom MITrac TC1500 SiCVVVF
Acceleration1 m/s2 (3.3 ft/s2)
Deceleration
  • 1.2 m/s2 (3.9 ft/s2) (service)
  • 1.3 m/s2 (4.3 ft/s2) (emergency)
Electric system(s)750 V DC third rail
Current collector(s)Collector shoe
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Safety system(s)Thales SelTrac® moving block CBTC ATC under ATO GoA 3 (DTO), with subsystems of ATP, NetTrac ATS and CBI
Coupling systemDellner
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Alstom Movia R151 is the seventh generation electric multiple unit (EMU) rolling stock in operation on the existing North–South (NSL) and East–West (EWL) lines of Singapore's Mass Rapid Transit (MRT) system. It is manufactured by Changchun Alstom Railway Vehicles, a joint venture of Alstom and CRRC Changchun under Contract R151 as part of their Movia family of trains.

The new rolling stock is set to progressively replace all of the C151s, C651s and C751Bs, all of which had been in service for at least 25 years when the R151s entered service in 2023. These new trains are part of the North–South and East–West lines' core systems upgrade and renewal programme. 106 six-car high-capacity trainsets comprising 636 cars were delivered from 21 February 2022 onwards, with the first train entering service on the East–West Line on 4 June 2023.