A7 motorway (Romania)

A7 motorway
The A7 motorway's planned route as of 2022
Interchange with the DN2F at Holt, east of Bacău
Route information
Maintained by Compania Națională de Administrare a Infrastructurii Rutiere
Length115.1 km (71.5 mi)
453.3 km (281.7 mi) planned
220.1 km (136.8 mi) under construction
62 km (39 mi) tendered
56.1 km (34.9 mi) under design
Existed2020–present
Major junctions
South end A 3 near Ploiești
Major intersections A 13 near Răcăciuni
A 8 near Pașcani
A 14 near Suceava
North end M 19 at Siret (border with Ukraine)
Location
CountryRomania
CountiesPrahova, Buzău, Vrancea, Bacău, Neamț, Iași, Suceava
Major citiesPloiești, Buzău, Focșani, Bacău, Roman, Pașcani, Suceava
Highway system
A 6 A 8

The A7 motorway (Romanian: Autostrada A7), also known as the Ploiești–Siret Motorway (Romanian: Autostrada Ploiești–Siret) or the Moldavia Motorway (Romanian: Autostrada Moldovei), is a partially built motorway in Romania, that upon completion will link Ploiești to the north-eastern part of the country, partly along the Pan-European Corridor IX. It will run along the route: Buzău, Focșani, Bacău, Roman, Pașcani, and Suceava, connecting to Ukraine's M19 highway near Siret.

As of 25 December 2024, 5 segments of the motorway are done, totaling to 115.1 km of opened motorway. All other sections of the motorway are in various stages of planning, tendering, and construction.

The Pașcani – Siret section will be financed through EU funds, while the government wants the Ploiești – Pașcani section (excluding the Bacău bypass) to be financed through the Romanian PNRR (short for Planul Național de Redresare și Reziliență, part of the Next Generation EU package).